| NO | CLIENT | PROJECT | YEAR |
|---|---|---|---|
| 1 | TDE/Shell | Tank 2 (Shell Tanjung Gelang Terminal) – January 2026 Tank Cleaning (Diameter: 19.42 m; U95) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2026 |
| 2 | TDE/Shell | Tank 11 (Shell Bagan Luar Terminal) – December 2025 Tank Cleaning (Diameter: 30.00 m; U97) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2025 |
| 3 | TDE/Shell | Tank 6 (Shell Tanjung Gelang Terminal) – November 2025 Tank Cleaning (Diameter: 25.42 m; U95) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2025 |
| 4 | TDE/Shell | Tank 10 (Shell Tanjung Gelang Terminal) – July 2025 Tank Cleaning (Diameter: 21.00 m; U95) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2025 |
| 5 | TDE/Shell | Installation of PRV – December 2024 Supply manpower to install PRV and standby leak/commissioning at Shell TGI TK6. |
2024 |
| 6 | MKRS/Chevron Prai |
TK 500 (Chevron Prai) October 2024 Supply 1 unit of vacuum truck for 3 days for tank cleaning works of Tank 500. |
2024 |
| 7 | TDE/Shell | Valve Replacement Works (Tank 6 Shell WPI) – August 2024 Conduct 12 inch- valve replacement works for tank 6 shell WPI. |
2024 |
| 8 | TDE/Shell | Tank 6 (Shell Westport) – July 2024 Tank Cleaning (Diameter: 25.9 m; U97) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2024 |
| 9 | LSE/Shell LOBP PD | Tank 2007 (Shell LOBP PD) – July 2024 Tank Cleaning (Diameter: 3.05 m) Isolation of tank, ventilation, manual desludging activities, internal tank cleaning, standby for SGS inspection, tank calibration & testing & commissioning. |
2024 |
| 10 | TDE/Shell | Tank 2 (Shell TGI) - July 2024 Tank Cleaning (Diameter: 19.5 m; U95) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking. |
2024 |
| 11 | KLK Palm Oleo Sdn Bhd | Tank 315, Tank 429, Tank 602 – June 2024 Tank cleaning works for Tank 315 (50 MT), Tank 429 (350 MT), Tank 602 (730 MT). |
2024 |
| 12 | KLK Palm Oleo Sdn Bhd | Tank 303, Tank 304, Tank 309 – June 2024 Tank cleaning works for Tank 303 (50 MT), Tank 304 (50 MT), Tank 309 (60 MT). Tank cleaning |
2024 |
| 13 | KLK Palm Oleo Sdn Bhd | Tank 315 (KLK Rawang) – May 2024 Tank cleaning works for Tank 315 (50 MT). |
2024 |
| 14 | TNB SJTJ | PD 1 & PD2 ECP Valves – May 2024 Supply PD1 & PD2 ECP Valves and pump for Tuanku Jaafar Power Station, PD. |
2024 |
| 15 | TDE/Petron PD | TK 19 -April 2024 Supply 1 unit of vacuum truck for one month for tank cleaning work of Tank 19. |
2024 |
| 16 | TDE/Kemaman Bitumen Company |
Tank 517 (KBC) – March – April 2024 Tank Cleaning & Steam Coil Cleaning (Diameter: 8.5 m; Bitumen) Bitumen tank cleaning by using pneumatic breakers and vacuum truck, manual desludging activities, Steam coil cleaning. |
2024 |
| 17 | TDE/Shell | Tank 10 (Shell PGI) – October 2023 Tank Cleaning (Diameter: 17.5 m; Diesel) Product transfer using diaphragm pump, positive isolation of tank, ventilation, manual desludging activities, internal tank cleaning. |
2023 |
| 18 | LSE/ Shell LOBP PD | Tank 2004 (Shell LOBP PD) – October 2023 Tank Cleaning (Diameter: 4.57 m) Isolation of tank, ventilation, manual desludging activities, internal tank cleaning, standby for SGS inspection, tank calibration & testing & commissioning. |
2023 |
| 19 | TDE/Shell | Tank 8 (Shell TGI) – Sep/October 2023 Tank Cleaning (Diameter: 20.00 m; U95) Product transfer using diaphragm pump, positive isolation of tank, drop valves, manual desludging activities, internal tank cleaning. IFC Jacking |
2023 |
| 20 | MKRS/ Chevron |
Tank 500 (Chevron Prai)- Sep 2023 Provision of Tank Cleaning Services Tank – Using Vacuum Truck Supply 1 unit of 10,000-liter vacuum truck to pump out sludge from Tank 500 |
2023 |
| 21 | LSE/Shell LOBP PD |
Tank 2054 (Shell LOBP PD) – August 2023 Tank Cleaning (Diameter: 4.57 m) Isolation of tank, ventilation, manual desludging activities, internal tank cleaning, hydrotest of steam coil. Standby for SGS inspection, tank calibration, testing & commissioning. |
2023 |
| 22 | Microsoft DTC | 6 units of Belly Tank (Microsoft DTC KUL 03, Cyberjaya) – July 2023 Ventilation, Internal Tank Cleaning, Power Brushing at Weldment Area |
2023 |
| 59 | TDE/Shell Westport | Tank 6 (Shell Westport ) Tank Cleaning (DIA 25.9 m; H 11 m) Isolation activities, transfer product and internal tank cleaning. Assist tank calibration team & standby leak for tank. | 2018 |
| 58 | Highbase/ PDB | FWT (PDB LANGKAWI) Tank Cleaning (DIA 9.4; H 6.0 ; FWT) Isolation activities, internal tank cleaning | 2018 |
| 57 | Highbase/ PDB | T-10 (PDB LANGKAWI) Tank Cleaning (DIA 14.64 ; H 9.26 m ; JET A-1) Valve Servicing/Maintenance Hydrotest of 8’,6’ & 4’’ valves Internal flushing of Sampling Tank 400 LTS | 2018 |
| 56 | Highbase/ PDB | T-02 (PDB SENAI)
Tank Cleaning (DIA 10.67; H 6.09; JET A-1)
Valve Servicing/Maintenance (2’’ & 4’’ Valves) Cleaning of Oil Interceptors, Assist Tank Inspection of T-02 |
2018 |
| 55 | Highbase/ PDB | T-5101A (PDB LUMUT) Tank Cleaning (DIA 25.0; H 20.0; ULG 95), Valve Servicing/Gland Packing Hydrotest of 16’’ & 12’’ valves Internal Float Roof Jacking of T5101A | 2018 |
| 54 | Highbase/ PDB | T-5101A (PDB LUMUT) Tank Cleaning (DIA 25.0; H 20.0; ULG 95), Valve Servicing/Gland Packing Hydrotest of 16’’ & 12’’ valves Internal Float Roof Jacking of T5101A | 2018 |
| 53 | Highbase/ PDB | T-201 (PDB KLIA) Tank Cleaning (DIA 31.5;H19.0) Power Brushing at Weldment area of T-201 Assist Tank Inspection | 2018 |
| 52 | Highbase/ PDB | ZT-01(SAFT) Tank Cleaning (DIA 8.5 ; H 10.0), Assist Tank Inspection | 2018 |
| 51 | TDR/PDB | Tank 801 ( PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2018 |
| 50 | TDR/PDB | Tank 6202 (PDB Melaka) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2018 |
| 49 | TDE/Shell | Tank 6 (SHELL TanjungGelang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2018 |
| 48 | TDR/PDB | Tank 2606 (PDB Malacca) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2018 |
| 47 | TDR/PDB | Tank 208 (PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2018 |
| 46 | TDE/Shell | (Shell Westport) Tank Cleaning (6 unit of tanks) Spading ,transfer product and internal tank cleaning | 2018 |
| 45 | TDE/Shell | Tank 1 (Shell PasirGudang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 44 | TDE/Petron | Tank 9 (Petron BaganLuar) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 43 | TDE/Petron | Tank 5 and 7 (Petron PasirGudang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 42 | TDE/Shell | Tank 2 (Shell Westport) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 41 | TDE/Shell | Tank 7 (Shell Westport) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 40 | TDR/PDB | Tank 202 (PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 39 | TDE/Shell | Tank 4(Shell PasirGudang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 38 | TDE/Shell | Tank 7(Shell Westport) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 37 | TDE/Shell | Tank 7(Shell BaganLuar) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 36 | TDR/PDB | Tank 206 (PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 35 | DANEX/ Petron | Tank 2055 (Petron PD) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 34 | TDE/Shell | Tank 6 (Shell TanjungGelang) Tank Cleaning Spading, transfer product and internal tank cleaning. | 2017 |
| 33 | TDR/PDB | Tank 207 (PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 32 | LSE/Shell | Tank 2051 (Shell LOBP) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2017 |
| 31 | TDE/Shell | Tank 3 (Shell PasirGudang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 30 | TDE/Shell | Tank 1 (Shell BaganLuar) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 29 | TDE/Shell | Tank 9 (Petron BaganLuar) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 28 | TDE/Shell | Tank 3 (Shell PasirGudang) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 27 | TDE/Shell | Tank 11 (Shell BaganLuar) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 26 | DIALOG/ Petronas | Tank 7516 (Petronas Melaka) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 25 | TDE/Petron | Tank 8 (Petron BaganLuar) Tank Cleaning To despade all inlet and outlet lines , pump out remaining product to drum ,entry to remove sludge and gas free. | 2016 |
| 24 | TDR/PDB | Tank 206 and Tank 208 (PDB KLIA) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2016 |
| 23 | TDR/Shell | Tank 2 (Shell BaganLuar) Tank Cleaning Spade line , dismantle manhole, remove sludge and internal cleaning. | 2016 |
| 22 | TDE/Petron | Tank 3010 Petron PD Tank Cleaning Drain/transfer oil to tanker or other tank using vacuum truck and air pump,isolation,spade and dismantle manhole. | 2015 |
| 21 | TDE/ Petronas | Tank 6292 (PDB Melaka) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2015 |
| 20 | DIALOG/ Petronas | Tank 7509 (Petronas Melaka) Tank Cleaning Spading ,transfer product and internal tank cleaning | 2014 |
| 19 | TDE/Shell | Tank 1213 Spading ,transfer product and internal tank cleaning | 2014 |
| 18 | TDE/Shell | Tank 7 (Shell Westport) Tank Cleaning Spading, product transfer and internal tank cleaning IFC Jacking of Tank 7 Touch up painting of Tank 7 | 2014 |
| 17 | TDE/Petron | Tank 33 and Tank 1 (Petron Port Dickson) Tank pad repair work Supply for filling manual compact inspection holes Isolation activities Removing & Installing new roof drain hose | 2014 |
| 16 | TDE/Shell | (Port PasirGudang) Spading, transfer product and internal tank cleaning Repair roof seal | 2014 |
| 15 | ESP/Lafarge | Rawang Tank Cleaning To carry out internal cleaning including pumping out/transfer balance product using vacuum truck, hydro jetting tank internal | 2014 |
| 13 | TDE/Petron | Tank 6 (Petron Kuantan) Tank Cleaning Supply manpower for pumping of oil and water from pontoon deck and internal,cleaning Removing of sludge, scrap rust and oil,cleaning gauge pole, Install cotter pin Install Neoprene rubber for top pontoon manhole and remove sludge and scale from site. | 2013 |
| 12 | TDE/Petron | Tank 12 (Petron BaganLuar) Tank Cleaning To spade all inlet and outlet lines Drop valves, transfer product, manual desludging, internal tank cleaning | 2013 |
| 11 | TDE/Shell | Tank 8 (Kuantan) To provide manpower, transport,lodging,tools and supervision to dismantle 8’’ valves 4’’ valves . To open manhole entry for cleaning of tank and box up after work completion. To descale using power brush and touch up painting for TK8. Modification of nozzles and pipes for Tank 1, Tank 7,Tank 9 Kuantan Port | 2013 |
| 10 | TDE/Shell | Tank 10 (BaganLuar) Tank Cleaning To connect 100 m hose connection, trasnfer product Dismantle manhole covers and internal tank cleaning | 2013 |
| 9 | TDE/Shell | Tank 1110 (Shell PD) To supply manpower to assist MFL Technician for bottom floor scanning and T1110 soil improvement | 2013 |
| 8 | TDE/Shell | Tank 1 (Petron Kuantan) To transfer product ,spade line, manual desludging and internal tank cleaning | 2013 |
| 7 | TDE/Shell | Tank 5 (Petron Kuantan) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |
| 6 | TDE/Shell | Tank 14 (BaganLuar) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |
| 5 | Sankyu/ Shell | Tank 2004 (Shell LOBP) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |
| 4 | TDE/ Petron | Tank 11 (BaganLuar) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |
| 3 | TDE/Petron PD | Tank 2054 (Petron PD) Spading of 16 points of flanges, Dismantle manhole covers, Internal tank cleaning Supply vacuum truck for Tank 2054 Standby manpower for ventilation Initiate leak test and touch up painting | 2013 |
| 2 | TDE/Shell | Tank 2054 (Shell PD) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |
| 1 | TDE/Shell | Tank 3 (BaganLuar) Tank Cleaning Transfer product, desludging and internal tank cleaning | 2013 |